Brussels Fleet: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{{CrewSidebarEN|place=E.P.O|street=Rue Gérard|number=47A|postalcode=1040|city=Brussels|captain=mArrr|navigator=Wissam|treasurekeeper=Muriel Colon|Program | {{CrewSidebarEN|place=E.P.O|street=Rue Gérard|number=47A|postalcode=1040|city=Brussels|captain=mArrr|navigator=Wissam|treasurekeeper=Muriel Colon|Program=Stephane Hadjizervoudakis|crewname=Brussels Fleet}} | ||
= Introduction = | = Introduction = | ||
'''[FR]''' : La Flotte bruxelloise a été mise sur pied dans la perspective des prochaines élections régionales à Bruxelles. La Flotte est composée de tous les équipages et de tous les Pirates de notre région. | '''[FR]''' : La Flotte bruxelloise a été mise sur pied dans la perspective des prochaines élections régionales à Bruxelles. La Flotte est composée de tous les équipages et de tous les Pirates de notre région. |
Revision as of 14:16, 1 September 2013
| |||
City | 1040 Brussels | ||
---|---|---|---|
Province | ? | ||
Region | ? | ||
Members | ? | ||
Captain | mArrr | ||
Navigator | Wissam | ||
Treasurer | Muriel Colon | ||
Status | ? | ||
Introduction
[FR] : La Flotte bruxelloise a été mise sur pied dans la perspective des prochaines élections régionales à Bruxelles. La Flotte est composée de tous les équipages et de tous les Pirates de notre région.
[EN] : The Brussels Fleet was setup to handle the next regional elections in Brussels. It is composed by all Crews and Pirates of our regio.
[NL] :
Our campaign website
Meetings
When
Brussels Fleet organises weekly meetings, on a week day (currently Monday) in the evening. All meetings are announced on the fleet website.
Brussels and language use
You can expect to hear and read a mix of French, English, and Dutch during our meeting. Currently the meetings are held in French/Dutch and wiki is available in English. Language use isn't fixed and can be adapted to suit any situation and/or individual.
Meeting Reports
Program
As decided on the July 8th meeting, every political domain will be covered by a five step process.
All the building process will be centralized on this wikipage